GPU clouds and inference providers
Blocks of up to about 10 MW per site with delivery-date discipline, at a size larger developers often overlook.
COMPUTE CAPACITY · UP TO ABOUT 10 MW PER SITE
Ananta develops compute-ready sites on distribution-scale interconnection. It is the deal size the hyperscale pipeline ignores, on timelines the large-load queue cannot match.
Talk with our development teamANANTANADI.COM
THE MECHANISM
Transmission-scale large-load interconnection is a national bottleneck. LBNL reports a median wait of about 4.5 years. FERC ordered all six U.S. grid operators to address large-load processes in June 2026.
Distribution-scale connections of up to about 10 MW per site follow each utility's distribution process instead. The work proceeds feeder by feeder on a months-scale path. The scarce asset is feeder headroom. Finding it is our discipline.
WHAT A SITE INCLUDES
Land control and public approvals completed.
Secured through the utility's own distribution process.
A practical route identified during development.
Headroom evaluated during screening so growth does not begin with a blank page.
Self-contained compute modules with integrated liquid cooling and external chillers arrive on a prepared pad. Electrical planning supports liquid-cooled racks.
Take an entitled, compute-ready site, or engage early for development to your specification.
We develop sites. We do not operate compute.
SITE SIZES
A site of up to about 10 MW uses about 5 to 10 acres inside a larger parcel, and the rest of the land stays with the landowner. Every site runs on the same pattern: one access point, one interconnection, and screening and buffer around the footprint. Acreage is approximate and site-specific.
WHO WE SERVE
Blocks of up to about 10 MW per site with delivery-date discipline, at a size larger developers often overlook.
Sites near demand that you control, with a clean public approval record.
Wholesale blocks with expansion headroom, ready for your customer model.
WHY DISTRIBUTED INFERENCE
Industry analyses project inference rising toward about 75% of AI compute by 2030. That creates a need for many well-placed regional sites, not one remote campus.
A network of distribution-connected sites of up to about 10 MW each brings proximity and speed-to-power together.
HOW TO ENGAGE
Sites are in active development across the Northeast and Mid-Atlantic.
In conversation under NDA, we share the parcel and setting, interconnection stage, permit status, timeline, and expansion path.
Capacity where the grid can actually deliver it.
Visualization
EXPERIENCE
Ananta is led by a team with two decades of utility-scale energy infrastructure development experience across U.S. markets.
Active across the Northeast and Mid-Atlantic.
COMPUTE INQUIRIES
Tell us your market, power range, timing, and facility requirements.